Looking for a scaffolding company for your next project?

Projects

Gleneagles Townhouse

37-39 St Andrew Square has been an incredibly exciting project for City Access. The building itself, is a piece of Edinburgh’s architectural history.

A temporary roof was required to protect external and internal historical listed features.

The scaffolding had to be designed to allow critical basement works to progress. We provided a designed truss out scaffold solution which was supported off the existing building at high level to allow the temporary roof to be erected early on.

The scaffold solution included a large, bespoke bird cage platform to allow the sensitive restoration of both the ornate plastering and the gold gilding to be completed.

Another key area was for City Access to provide access solutions to the six ornate statues to aid careful works to allow the restoration to be carried out.

South boundary wall

We were asked to return to the Scottish Government’s St Andrews House building after completing multiple projects to deliver its most restricted area access to date.

Our client, Mpact Group, required access to the South Boundary Wall overlooking Edinburgh’s Waverley Train Station. The wall is located on a bedrock cliff face with minimal footing for the scaffold so our team used the same method as on Governor’s House of a designed anchored tie/support detail at base of scaffold. We also used a slung/hanger system where the footing was non existent.

The scaffold was splayed in most areas of the 157m long wall and we erected a small roof system while shrink wrapping the external face to shelter from the wintry Scottish elements to ensure clients works were unhindered.

CASTLEBRAE HIGH SCHOOL​

We are delighted to be onsite in Craigmillar, after being awarded the scaffolding package for the brand new Castlebrae High School.

This is a particularly great project to be involved in as we have members of staff who attended Castlebrae High School as young boys so to return as skilled tradesmen to work on the school for the next generation is a wonderful opportunity.

The new school will not only provide a modern learning estate for pupils and staff, but will be a fantastic asset to the community, contributing to the ongoing regeneration of the area.

Featured Works

“Robertson Construction Central East employed City Access Scaffolding to be our work at height partner for all scaffolding requirements on the project. The construction phase plan identified that work at height was one of the biggest H&S risks on the project given the level of refurbishment and M&E riser replacement. CASL rose to the challenge attending all preconstruction meetings developing detailed engineering designs for the atrium birdcage; vertical riser scaffolds; horizontal crawl spaces; cantilever roof scaffolds, culminating in a free standing 6m high buttressed scaffold encapsulating a listed stone façade. Nothing has ever been a problem to overcome and the team at City are only a phone call away for providing additional advice and support. The work ethic, respect, openness and positive attitude of all CASL employees is first class. Robertson and CASL values of “one team” are clear to see from everyone and everything we have achieved to date. Relationships and friendships have been formed that will no doubt be maintained in the future.”
Owen Cherrie
Senior Project Manager, Robertson